Results 1 to 10 of 13
Like Tree2Likes

Thread: building

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Rookie
    Join Date
    Nov 2012
    Posts
    50
    Quote Originally Posted by Saransh Vatsa View Post
    Video Wall is the last level of Scoreboard. It is maxxed out after u build video wall as there is nothing left to upgrade there. Even mine is unupgradable and it is written "Maxxed Out". It is the same when the pitch reaches "Under Soil Heating". My Floodlights too are maxxed out. Slowly every thing will get maxxed out and there will be nothing to build. Ur stadium too will max out after "World Arena" which I guess is level 16
    i know but floodlights won't go above lvl 8 and video wall above lvl 9. to build others i need these two at lvl 10. because of this i can't bukld other.

  2. #2
    Champion Saransh Vatsa's Avatar
    Join Date
    Sep 2013
    Location
    Milky Way
    Posts
    2,814
    Quote Originally Posted by Kinley Tenzing View Post
    i know but floodlights won't go above lvl 8 and video wall above lvl 9. to build others i need these two at lvl 10. because of this i can't bukld other.

    Really???? I thought u can still upgrade other facilities if one is maxxed out..... That is the case with everyone. I think ur game got a bug, better contact Nordeus Support


    Should Kaka' have been selected for Brazil's WC squad?
    Tell us ur opinion-

    http://forum.topeleven.com/football-...-new-post.html

    P.S.S The person in my avatar is NOT me! He is the God of Cricket, Sachin Tendulkar.

  3. #3
    Rookie
    Join Date
    Nov 2012
    Posts
    50
    building-7.jpg

    here is an example. check the last one, it say to build this one we need to construct another item of this category and all other facilities at level 9