Results 1 to 10 of 13
Like Tree1Likes

Thread: Stadium question

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Addicted
    Join Date
    Jan 2013
    Location
    North Carolina
    Posts
    539
    no...building seats will lower the cost and build time of your stadium.

    Build the seats, 1 upgrade at a time, then build the stadium (which will only take 3 days, instead of 16) to take advantage of ticket sales after each upgrade.
    MightyOri likes this.

  2. #2
    Newbie
    Join Date
    Mar 2013
    Posts
    28
    Quote Originally Posted by tarcanes92 View Post
    no...building seats will lower the cost and build time of your stadium.

    Build the seats, 1 upgrade at a time, then build the stadium (which will only take 3 days, instead of 16) to take advantage of ticket sales after each upgrade.
    Thanks for sharing the trick

  3. #3
    Banned
    Join Date
    Feb 2013
    Location
    Jawa
    Posts
    897
    Quote Originally Posted by tarcanes92 View Post
    no...building seats will lower the cost and build time of your stadium.

    Build the seats, 1 upgrade at a time, then build the stadium (which will only take 3 days, instead of 16) to take advantage of ticket sales after each upgrade.
    This. And you can upgrade other facilities more flexible, especially u-21 facility.