Results 1 to 2 of 2

Thread: Can't change the orders and tactics

  1. #1
    Apprentice Guilherme1337's Avatar
    Join Date
    Apr 2017
    Location
    Portugal
    Posts
    197

    Can't change the orders and tactics

    Every time I try to change a single thing in my starting 11, it just kicks me out of the game and it won't save the changes. Is this happening with ya guys?

  2. #2
    Moderator dave1311's Avatar
    Join Date
    Jun 2014
    Location
    Northallerton, United Kingdom
    Posts
    1,948
    Try reinstalling the game.


    Sent from my iPad using Tapatalk
    ROMANBY VILLAGE FC (founded December 24th 2013)
    Level 139
    50 League
    8 Champions/Elite League
    4 Super League/Gold Cup
    12 Cup

    1 Super Cup

    Top Eleven Forum Moderator